Primavera p3 for windows windows#
Several windows can be open simultaneously.
Planning & Control Basic Layout of P3 _ A window provides a variety of functions and work areas:
Instruction 1.3: P3 is Windows oriented: 1. You should be presented with a menu for performing tasks such as CUT and COPY of the activity. Right button, click and release = go to a deeper level of information topical to the region selected. The activity form should appear at the bottom of the screen showing information on activity System Design. If there is a large gray information box covering approximately the lower third of the screen (the so called activity form), then you should hide it by pressing the key. Left button, double click and release (rapid) = select and execute item indicated go to a deeper level of information/options topical to the item selected. The activity AS101 should now be repositioned after activity CS440. In the Activity ID area of the screen, click activity AS101 and drag to just beyond CS440. All activities between these two should be highlighted. In the Activity Description area of the screen, click and drag to select from activity System Design to activity Review and Approve. Left button, click down and drag and release = select region or move an object. This activity should now be highlighted, indicating that you may now perform some function on it, such as to delete it. Left button, click down and release = select or deselect. Select FILE OPEN, then select the project file APEX (so that it is highlighted) click on Exclusive (so that I is checked – this gives you more control when editing a project) OK This sample project will be used as a demonstration in the following instructions. Load your student (demo) version of Primavera Project Planner (P3) on your computer (in a subdirectory of your choice), in accordance with the software’s instruction manual. Instruction 1.1: Setting-up and running Primavera Project Planner (P3). Note, text that is underlined requests you to do something.
Primavera p3 for windows software#
Tutorial 1: Basic Layout of Primavera Project Planner (P3) In this tutorial, you will obtain an overview of the basic layout, features and usage of the P3 software package. Oracle Primavera P3, a long-established product, is used in its various forms by 25% of the world’s heavy manufacturing industries. Nearly 40% of general contractors with an annual revenue of $ 5 million to $ 10 million use Primavera. By comparison, P6 software did not participate in the CFMA 2008 study of the United States manufacturing industry. The changes from the Primavera P6 version to the Primavera P3 version are more about moving from DOS shortcut keys to icons for mouse clicks.Planning & Control Basic Layout of P3 _ Primavera P6 software is also used to schedule and control various projects. In construction, industrial and software projects where various activities are performed regularly, this software can also be used to schedule and control the project and estimate the cost of those projects. Primavera P6 is a product of Oracle, one of the best, most powerful, most reliable programs in the field of project management, design and implementation. This software is a suitable solution for managing projects and plans in any dimensions and size and with any degree of difficulty.